Kinectrics

We converted a 20ft container into a 50/50 office store unit for Kinectrics, supporting their HVDC cable testing projects with flexible, on-site workspace.

Client Kinectrics

Location Middlesbrough

Sector Infrastructure

Number of Units 1

Kinectrics Conversion On Site

When both workspace and storage are needed on site, a container conversion is a smart, all-in-one solution. 50/50 office stores are a popular choice for teams looking for a secure place to work with convenient access to tools, equipment, or materials.

For this build, Kinectrics approached us to create a unit that could function as both a practical office and a designated store - all within a single 20ft container. Kinectrics are a company that develops innovative solutions for the global electricity and medical industries, helping to empower a sustainable future. 

Kinectrics Conversion

We began by installing a full-height partition to divide the container into two distinct areas, then equipped both sections with electrics and lighting to support everyday use.

The office side includes a single personnel door and two shuttered windows. The door allows secure, convenient access for staff, while the windows introduce natural light, creating a brighter and more comfortable workspace. Steel shutters provide added security when the unit is not in use - ideal for remote or unsupervised sites.

Kinectrics Conversion

The storage area includes ply lining for a clean, durable finish that protects the container walls, double personnel doors for wider access to larger items, and two small lockable access panels.

Finished in a fresh RAL 5015 respray, the unit has a clean, professional look that stands out on site. It now forms part of Kinectrics’ High Voltage Direct Current testing kit, serving as a support unit for cable testing - with the flexibility to be deployed across multiple global projects.

Kinectrics Conversion

I would like to thank everyone involved for the fast and efficient service provided during the manufacture and delivery of our recent equipment order.

The team's professionalism and dedication made the entire process seamless, and we truly appreciate the timely manner in which everything was handled.

The quality of the equipment exceeded our expectations, and we look forward to putting it to use in the field.

Paul Jones, H/V Test Engineer at Kinectrics 


Talk to us about your container project today...

Make an enquiry